AC COACHES
Types of AC coaches- Self generated- Conventional & RMPU type
- EOG - Conventional & RMPU type
Power supply for AC equipments is met from axle driven transom mounted brushless alternator rated 110v DC supply.
Equipments:
- 2 X 18 kw alternator running at > MFO
- 800 Ah cells,
- 200A cap battery charger,
- 415 v, 50 Hz, 3 phase pre-cooling plug- 2 nos,
- RRU- 18 kw at 130V
Power supply is derived from DG set 415 V/ 750v, 3 phase, 50 Hz. Power is distributed to entire rake through 2 sets of 3 phase, 415/ 750 v feeders. Each coach is provided with control, distribution and feeder arrangement on control panel. The AC equipments works on 415 v supply and lighting equipment on 110 v AC obtained from 3 KVA, 415 / 190 V, 4 wire step down transformer.
Drawback of conventional type AC coaches:
It has open type of compressor system, so…
- More spacious, heavy weight, more maintenance cost.
- More leakage problem from pipes and joints.
- More man power required.
- Consuming more, less energy efficient.
- Light in weight.
- low cost of installation
- no water leakage
- Hermetically sealed compressor, so no out side fittings.
- Use of 3 phase induction motor, less maintenance cost.
- No chance of damage by CRO and flash flood etc.
- More energy efficient, modern technology and excellent performance.
Comparison of RMPU with conventional AC coach
| SN | Description | Roof mounted | Conventional |
| 1 | weight | 900 kg | 2700 kg |
| 2 | Installation time | 4 hrs | 4 days * |
| 3 | Refrigerant | F-22 (CHCl F 2) | F-12 (CCl 2 F 2) |
| 4 | Refrigeration charge | < 3 kg | 15 – 20 kg |
| 5 | System design | Hermitically sealed | Open |
| 6 | Refrigerant leak potential | Nil | Enormous |
| 7 | Maintenance | little | Heavy |
| 8 | Dust collection | little | Heavy |
| 9 | Damage due to CRO | NIL | Heavy |
| 10 | Damage due to flash flood | NIL | Heavy |
| 11 | Performance | Excellent | Deteriorates quickly due to dust collection. |
| 12 | Technology | latest | Old and absolute. |
| 13 | Water drop on passenger | NIL | sometimes |
| 14 | Fresh air | Taken from roof | Taken from side wall of toilet |
| 15 | Capacity control | 25% to 100% (4 compressors) | 50% to 100% (2 compressors) |
| 16 | Down time for repair | 4 hrs (for replacement of RMPU) | 4 days (depends upon the equipment failed) |
| 17 | Motor used | 3 phase I.M. | DC motor |
| 18 | Tones | 7.0 x 2 | 5.2 X 2 |
| 19 | Energy consumption | less | More |
| 20 | Humidity control | By microprocessor based controlling system | Old conventional method |
No comments:
Post a Comment